
            | Items | 
					 					CSSC Steel Side Chute  | 
				
					 					VD-6 Vertical Discharge Chute  | 
				
					 					VD-8 Vertical Discharge Chute  | 
				
					 					RSC Rubber Deflector Chute  | 
				
					 					GAC-4 Grouting Attachment  | 
                |||||
| Description | N/A The CSSC long side chute diverts concrete discharge toward the front of the bucket. | N/A The VD-6 discharge chute attachment allows placement of concrete in forms and minimizes segregation due to free-fall. | N/A The VD-8 discharge chute attachment allows placement of concrete in forms and minimizes segregation due to free-fall. | N/A The RSC rubber side chute for side discharge of concrete in forms, against walls, etc. | 
                                            
                                            
                                                N/A
                                                 The GAC-4 grouting attachment is for placement of grout in confined places.  | 
                                |||||
| Description | N/A CSSC Steel Side Chute | N/A VD-6 Vertical Discharge Chute | N/A VD-8 Vertical Discharge Chute | N/A RSC Rubber Deflector Chute | N/A GAC-4 grouting attachment | |||||
| Manufacturer | N/A GAR-BRO | |||||||||
| 
                         | 
                ||||||||||