Items |
CSSC Steel Side Chute |
VD-6 Vertical Discharge Chute |
VD-8 Vertical Discharge Chute |
RSC Rubber Deflector Chute |
GAC-4 Grouting Attachment |
|||||
Description | N/A The CSSC long side chute diverts concrete discharge toward the front of the bucket. | N/A The VD-6 discharge chute attachment allows placement of concrete in forms and minimizes segregation due to free-fall. | N/A The VD-8 discharge chute attachment allows placement of concrete in forms and minimizes segregation due to free-fall. | N/A The RSC rubber side chute for side discharge of concrete in forms, against walls, etc. |
N/A
The GAC-4 grouting attachment is for placement of grout in confined places. |
|||||
Description | N/A CSSC Steel Side Chute | N/A VD-6 Vertical Discharge Chute | N/A VD-8 Vertical Discharge Chute | N/A RSC Rubber Deflector Chute | N/A GAC-4 grouting attachment | |||||
Manufacturer | N/A GAR-BRO | |||||||||
|